Mooring and Riser Analysis

Mooring Analysis

With the complex nature of the Offshore Environment and the Risk Involved, it becomes very important to Analyze and Design any support system more conservatively which has a significant effect on Offshore Safety and Operation. Aryatech’s in-depth Technical Expertise and Industry Knowledge has the capability to undertake a variety of complex projects;

  • Mooring Analysis of Offshore work-cum-Accommodation Barges
  • Pipe Laying Analysis
  • General Line Dynamics and Motion Prediction

 

Mooring Analysis has become an essential tool to simulate complex nature of Station Keeping to ensure safety and to reduce risk during Offshore Operation. Mooring Analysis is vastly required in case of:

  • Complex platform and Sub-Sea Infrastructure  Vessel Positioning in close proximity to Assets
  • Longer Mooring durations Operational Requirement: Gangway Connections, Helicopter
  • Operations, Vessel Response under Accidental Damage of a Line, Support Vessel’s movement in close proximity to the Barge, Connection to Jacket leg, DP buoys, etc.

Coupled analysis

  • Time-Domain Dynamic Coupled Analysis  
  • Non-Linear Large Displacement Analysis
  • Modal Analysis
  • Fully Coupled Tension, Bending, and Torsion Analysis
  • Heavy Weather Mooring Analysis
  • Line Load Calculation
  • Jetty / Fender Load Calculation

For training or job enquires, Please call on these numbers: +91-11-46018102; +91-11-41090388